CANAL BRIDGE - STREPY-BRACQUEGNIES

DESCRIPTION Crossing an almost 500 m valley at a height of between 12 and 20 metres with a waterway of 33 metres working width and 4.15 metres draught. This requires an imposing, if not overwhelming piece of engineering. To integrate this work into its environment, the BEG architectural consultancy opted for a simple, repetitive and visually restful structure, rather than an artificially complicated project seeking to be forgotten by plays of shapes and colours. The consultancy insisted, however, on top quality execution with no open construction joints visible on the exposed faces. To avoid a crushing impression, it spaced the columns 36 metres apart, an unusually wide span for this type of work that needs to support more than 4 tons per square metre. The result is a project consisting of two inclined side walls comprising variable curvatures with a total height of 7.1 metres. 498 metres long, these are cast in a single piece to reduce the number of expansion and sealing joints. On these longitudinal carrying elements are then set, every 4.5 m, 27 metre long fishbelly cross-members, which support the canal floor slab. In this way the waterway has a total width of 46 metres at its base and a height of 7.1 metres, resting on two rows of 14 columns each - one row per side wall – set 36 metres apart longitudinally and 33.4 metres cross-wise.
The columns Key figures. Superstructure:

concrete : 25,800 m³ reinforced steel : 3,350 t prestressed : 875 t Infrastructure

concrete : 9,100 m³ reinforced steel : 850 t Foundations

reinforced steel : 250 t Earthworks

clearing: 370,000 m³ filling: 320,000 m³ The Sart canal bridge is the world's heaviest incrementally launched bridge, with the moving mass reaching 65 tonnes at the end of the sliding process. At the same time, the huge longitudinal inertia of the deck combined with severe aesthetic constraints led the engineering team to devise technical solutions that are not standard for launched bridges.

October 1998 Beginning of construction. February 2000 Launch of first stage.

Tags: FAQ Ю
Subscribe

Recent Posts from This Journal

  • Post a new comment

    Error

    Comments allowed for friends only

    Anonymous comments are disabled in this journal

    default userpic

    Your reply will be screened

    Your IP address will be recorded 

  • 8 comments